Countries · Australia国家地区 · 澳大利亚

Where can AI data centres be built in Australia, and how do power, water rules and climate shape the cooling?澳大利亚哪里建得起 AI 数据中心?电力、用水规则和气候怎样影响冷却选择?

NEM data centres use only 27% of their 2.2 GW grid connection.NEM 数据中心只用了 2.2 GW 并网容量的 27%。

AEMO expects 1.7 GW average demand by FY2030.AEMO 预计 2030 财年平均需求约 1.7 GW。

Sources checked 2026-10-16; climate from hourly observations 2020–2024来源核查 2026-10-16;气候来自 2020–2024 年逐时观测

Build scale: 6 sourced facts建设规模:6 条有来源 Policies: 3 sourced facts政策:3 条有来源 Efficiency rules: 2 sourced facts能效要求:2 条有来源 Power: 5 sourced facts电力:5 条有来源 Water: 2 sourced facts水:2 条有来源Climate: 3 weather stations, 2020–2024气候:3 个气象站,2020–2024

PUE requirement or targetPUE 要求或目标

1.25

NSW design PUE target for new data centres (with design WUE ≤ 1.0 on potable water); or 1.3 with WUE ≤ 0.44新州新建数据中心设计 PUE 目标(自来水时设计 WUE ≤ 1.0);或 PUE 1.3 且 WUE ≤ 0.44

Guideline measure指引要求Average annual climate, 100% IT load年均气候,100% IT 负荷NSW新州

WUE requirement or targetWUE 要求或目标

≤1.0≤1.0L/kWh

NSW design WUE (dWUE) target on potable water with dPUE 1.25 (≤ 1.6 on non-potable water), or ≤ 0.44 with dPUE 1.3. The guideline measures WUE under ISO/IEC 30134-9 but prints no unit; we read it as L/kWh (equal to m³/MWh)新州设计 WUE(dWUE)目标:自来水、dPUE 1.25 时 ≤ 1.0(非饮用水 ≤ 1.6),或 dPUE 1.3 时 ≤ 0.44。指引按 ISO/IEC 30134-9 计量 WUE,但未印出单位;本站按 L/kWh(等于 m³/MWh)理解

Guideline measure指引要求Average annual climate, 100% IT load年均气候,100% IT 负荷source来源

Power build-out电力建设规模

67.1GW

Data-centre capacity at all stages advised to AEMO, including operating sites, March 2026 (37.9 GW a year earlier)2026 年 3 月向 AEMO 报送的各阶段数据中心容量,含运营站点(一年前 37.9 GW)

Mostly proposed or at enquiry大部分处于提议或咨询阶段AEMOAEMO

Biggest constraint最大约束

Power电力

The biggest constraint is power: the federal and Victorian governments have announced that new large data centres must underwrite or bring new supply, and National Cabinet intends legislation on energy, water and land standards for early 2027.最大约束是电力:联邦和维州政府已宣布,新建大型数据中心须为新增电源提供担保或自带电源;全国内阁拟于 2027 年初就能源、用水和土地标准立法。

Our reading of the sourced rules本站对有来源规则的解读Second: water其次:水source来源
Data-centre power in the NEM: connection capacity today, and average load actual and forecast (MW)NEM 数据中心电力:当前接入容量,以及平均负荷的实际值与预测(MW)
Connection capacity: operating sites, Q1 2026接入容量:运营站点,2026 年第一季度 2,200 MW2,200 MWAverage load: actual, FY2026, all of Australia平均负荷:实际,2026 财年,澳大利亚全国 ~580 MW约 580 MWAverage load: AEMO forecast, FY2030平均负荷:AEMO 预测,2030 财年 ~1,700 MW (forecast)约 1,700 MW(预测)Average load: AEMO forecast, FY2036平均负荷:AEMO 预测,2036 财年 ~3,900 MW (forecast)约 3,900 MW(预测)
Capacity, Q1 26接入容量 26Q1 2,200Avg load, FY26 (all AU)平均负荷 FY26 全国 ~580Avg load, FY30平均负荷 FY30 ~1,700Avg load, FY36平均负荷 FY36 ~3,900
Solid: actual. Hollow: AEMO forecast (Step Change). Two different measures: connection capacity is the maximum load the sites may draw under their grid agreements; average load is the energy used in a year divided by 8,760 hours. The FY2026 average load is for all of Australia; the other bars are for the NEM. AEMO publishes no forecast of connection capacity. Average load is not capacity: in Q1 2026 the sites drew about 27% of their connection capacity, and AEMO assumes a mature fleet draws 45–51%. At that share, about 1.7 GW of average load in FY2030 would need roughly 3.3–3.8 GW of connection capacity, and more if the fleet is not yet mature (this site's estimate, not an AEMO figure).实心:实际。空心:AEMO 预测(Step Change)。这是两种不同的量:接入容量是站点按并网协议最多可取用的负荷;平均负荷是全年用电量除以 8,760 小时。2026 财年平均负荷为澳大利亚全国数字,其他各柱为 NEM。AEMO 没有公布接入容量的预测。平均负荷不等于容量:2026 年第一季度站点只取用了接入容量的约 27%,AEMO 假设成熟的数据中心群可取用 45–51%。按此比例,2030 财年约 1.7 GW 的平均负荷约需 3.3–3.8 GW 的接入容量;若数据中心群尚未成熟,所需容量更多(本站估算,不是 AEMO 数字)。
National Electricity Market (not WA or NT), except the FY2026 average load, which Oxford Economics Australia gives for all of Australia. Connection capacity is the maximum connection capacity of operating sites; average load is the load drawn on average over the year; the forecasts are AEMO's indicative average demand in its 2026 ESOO Step Change scenario, shown on AEMO's GW axis, which equals TWh ÷ 8.76 (8,760 hours a year); they are not connection capacity or peak demand. The values have different bases and are not added.国家电力市场(不含西澳和北领地),但 2026 财年平均负荷为 Oxford Economics Australia 给出的澳大利亚全国数字。接入容量为运营站点的最大接入容量;平均负荷为全年平均取用的负荷;预测为 AEMO 2026 ESOO Step Change 情景的指示性平均需求,取自 AEMO 图中的 GW 坐标轴,等于 TWh ÷ 8.76(每年 8,760 小时);不是接入容量,也不是峰值需求。各数值口径不同,不相加。

Thermal meaning热管理含义

Policy, efficiency, power and water政策、能效、电力与用水

Policies政策

  • National Cabinet agreed to develop consistent mandatory standards for data-centre energy, water and land use, with legislation intended for early 2027.全国内阁同意制定统一的数据中心能源、用水和用地强制标准,计划 2027 年初立法。 announced已宣布 2026-08-26 source来源
  • Victoria's data-centre plan: bring own renewable supply and storage, match new demand with new generation, no data centres in residential zones and a 150 m buffer to homes.维州数据中心计划:自带可再生电源和储能、新增需求须匹配新增发电、不得建在住宅区、与住宅保持 150 米缓冲距离。 announced已宣布 2026-09-22 source来源
  • NSW commits to the development application assessment for data-centre projects that meet its guideline measures taking no longer than 75 days in state government hands.新州承诺,满足指引要求的数据中心项目,其开发申请评估在州政府手中的时间不超过 75 天。 in force (policy)生效(政策) 2026-08-17 source来源

Efficiency rules能效要求

  • NSW design targets for new data centres: dPUE ≤ 1.25 with dWUE ≤ 1.0 (potable) or ≤ 1.6 (non-potable), or dPUE ≤ 1.3 with dWUE ≤ 0.44, at the average annualised climate and 100% IT load.新州新建数据中心设计目标:dPUE ≤ 1.25 且 dWUE ≤ 1.0(自来水)或 ≤ 1.6(非饮用水),或 dPUE ≤ 1.3 且 dWUE ≤ 0.44,按年均气候和 100% IT 负荷计。 guideline measure (75-day assessment)指引要求(75 天审批承诺) 2026-08 source来源
  • New Commonwealth data-centre facilities sourced outside the government panel must achieve 5-star NABERS Energy for Data Centres or equivalent, such as PUE 1.4 or less.联邦政府在采购框架外新租用或自有的数据中心须达到 NABERS 数据中心能效 5 星或同等水平,例如 PUE 不高于 1.4。 in force from 2025-07-01自 2025-07-01 生效 source来源

Power电力

  • Operating data centres in the NEM hold about 2.2 GW of maximum connection capacity and used about 27% of it in Q1 2026, at a load factor near 90%.NEM 运营中的数据中心持有约 2.2 GW 的最大接入容量,2026 年第一季度只用了其中约 27%,负荷率接近 90%。 actual实际 2026-Q1 source来源
  • AEMO assumes a mature data-centre fleet will draw on average 45–51% of its connection capacity, depending on data-centre type.AEMO 假设成熟的数据中心群平均取用其接入容量的 45–51%,视数据中心类型而定。 forecast assumption预测假设 2026-08 source来源
  • AEMO shows its consumption forecast also as indicative average demand in GW; its GW axis equals TWh ÷ 8.76: about 1.7 GW in FY2030 and 3.9 GW in FY2036 (Step Change).AEMO 同时以 GW 表示的指示性平均需求展示其用电预测;其 GW 坐标轴等于 TWh ÷ 8.76:2030 财年约 1.7 GW,2036 财年约 3.9 GW(Step Change)。 forecast预测 2026-08 source来源
  • The Prime Minister announced a legal obligation for the next generation of large data centres to underwrite new power supply, pay their full share of grid connection and be net generators.总理宣布将立法要求下一代大型数据中心为新增电源提供担保、全额承担并网成本,并成为净发电方。 announced已宣布 2026-07-15 source来源
  • The AEMC advised ministers that data centres should surrender renewable certificates from new generators, show demand covered by new firm capacity, register as market participants and be flexible; governments decide.AEMC 建议部长:数据中心应交回新增发电的可再生能源证书、证明需求有新增稳定容量覆盖、注册为市场参与者并提供灵活性;由政府决定。 advice建议 2026-08-05 source来源

Water水

  • NSW: data centres with water-intensive cooling use recycled water for 100% of cooling, or agree a transition to rainfall-independent water with their utility; interim potable use must allow cuts in drought, for example with hybrid cooling.新州:用水密集型冷却的数据中心须 100% 使用再生水,或与供水公司约定向不依赖降雨的水源过渡;过渡期使用自来水的须能在干旱时减少用水,例如采用混合冷却。 guideline measure (75-day assessment)指引要求(75 天审批承诺) 2026-08 source来源
  • Victoria: data centres will use recycled or non-drinking water for cooling, or offset their use and pay for upgrades; today they use less than 1% of Victoria's drinking water for cooling.维州:数据中心冷却将使用再生水或非饮用水,否则须抵消用量并支付改造费用;目前其冷却用水不足维州饮用水的 1%。 announced已宣布 2026-09-22 source来源

Projects项目

Company公司Place地点As stated by the company公司表述Kind类型Source来源
AirTrunkMelbourne墨尔本MEL2: over 354 MW, a site acquired for a second Melbourne campus (announced 2025-12-23); total deployable capacity in Melbourne over 630 MWMEL2:超过 354 MW,为墨尔本第二个园区收购的场地(2025-12-23 宣布);墨尔本可部署总容量超过 630 MWcapacity容量link链接
NEXTDCWestern Sydney悉尼西部S7 Eastern Creek 550 MW+ IT capacity, in planning; S4 Horsley Park 365 MW IT capacityS7 Eastern Creek 550 MW 以上 IT 容量,规划中;S4 Horsley Park 365 MW IT 容量capacity容量link链接
AWSnot named未注明AU$20 billion, 2025–2029 (no MW stated)2025–2029 年 200 亿澳元(未写 MW)investment投资link链接
Microsoftnot named未注明A$25 billion by the end of 2029; footprint up more than 140% (no MW stated)2029 年底前 250 亿澳元;规模扩大 140% 以上(未写 MW)investment投资link链接

Capacity and investment are different measures and are never added. Capacities are the companies' own figures, with their qualifiers.容量和投资是不同的量,不相加。容量为公司自己的数字,保留其限定词。

What is not covered: 未覆盖:No official Victoria-only or Sydney-only MW totals were found. Federal and Victorian measures are announced, not yet law.未找到维州或悉尼单独的官方 MW 合计。联邦和维州措施为已宣布,尚未立法。

Database view: every Australia number and fact on this page, with its source wording数据库视图:本页全部澳大利亚数字和事实及来源原文71 rows71 行
Showing显示 71Quotes are the source's own wording. Main series: National Electricity Market (not WA or NT), except the FY2026 average load, which Oxford Economics Australia gives for all of Australia. Connection capacity is the maximum connection capacity of operating sites; average load is the load drawn on average over the year; the forecasts are AEMO's indicative average demand in its 2026 ESOO Step Change scenario, shown on AEMO's GW axis, which equals TWh ÷ 8.76 (8,760 hours a year); they are not connection capacity or peak demand. The values have different bases and are not added. Climate rows: hours a year (2020–2024 average) a dry cooler alone can make the water, from NOAA hourly observations, assuming the dry cooler supplies the facility water directly (a plate heat exchanger in between adds its own approach, so fewer hours). Missing hours are scaled from the observed share of each year to 8,760 hours.引文为来源原文。主序列:国家电力市场(不含西澳和北领地),但 2026 财年平均负荷为 Oxford Economics Australia 给出的澳大利亚全国数字。接入容量为运营站点的最大接入容量;平均负荷为全年平均取用的负荷;预测为 AEMO 2026 ESOO Step Change 情景的指示性平均需求,取自 AEMO 图中的 GW 坐标轴,等于 TWh ÷ 8.76(每年 8,760 小时);不是接入容量,也不是峰值需求。各数值口径不同,不相加。气候行:仅靠干冷器即可制水的年小时数(2020–2024 年平均),来自 NOAA 逐时观测,假设干冷器直接供设施水(中间若有板式换热器,会再增加其接近温差,小时数更少)。缺测小时按每年已观测的比例折算为 8,760 小时。
Field字段Fact事实Status状态Date日期Source wording来源原文Source来源
Build scale建设规模Data-centre power in the NEM: connection capacity today, and average load actual and forecast (MW)NEM 数据中心电力:当前接入容量,以及平均负荷的实际值与预测(MW): Connection capacity: operating sites, Q1 2026接入容量:运营站点,2026 年第一季度, 2,200 MWactual实际2026-08As of quarter 1 2026, operating data centres across the NEM are estimated to have a total of 2.2 GW of maximum connection capacity provided by distribution network service providers (DNSPs) and TNSPs.link链接
Build scale建设规模Data-centre power in the NEM: connection capacity today, and average load actual and forecast (MW)NEM 数据中心电力:当前接入容量,以及平均负荷的实际值与预测(MW): Average load: actual, FY2026, all of Australia平均负荷:实际,2026 财年,澳大利亚全国, around 580约 580 MWactual实际2026the utilised capacity of Australia’s data centre fleet is estimated to have averaged around 580 MW in FY26.link链接
Build scale建设规模Data-centre power in the NEM: connection capacity today, and average load actual and forecast (MW)NEM 数据中心电力:当前接入容量,以及平均负荷的实际值与预测(MW): Average load: AEMO forecast, FY2030平均负荷:AEMO 预测,2030 财年, around 1700约 1700 MWforecast预测2026-08consumption is forecast to triple to around 15 TWh or 7.8% of forecast operational consumption by 2029-30 and grow nearly seven times to around 34 TWh or 13% of forecast operational consumption by 2035-36link链接
Build scale建设规模Data-centre power in the NEM: connection capacity today, and average load actual and forecast (MW)NEM 数据中心电力:当前接入容量,以及平均负荷的实际值与预测(MW): Average load: AEMO forecast, FY2036平均负荷:AEMO 预测,2036 财年, around 3900约 3900 MWforecast预测2026-08consumption is forecast to triple to around 15 TWh or 7.8% of forecast operational consumption by 2029-30 and grow nearly seven times to around 34 TWh or 13% of forecast operational consumption by 2035-36link链接
Build scale建设规模AEMO counts around 165 data centres in the NEM, which used approximately 5 TWh in FY2026, around 3% of NEM operational consumption.AEMO 统计 NEM 内约 165 个数据中心,2026 财年用电约 5 TWh,约占 NEM 运行用电的 3%。actual实际FY2026Today, there are around 165 data centres that consumed approximately 5 terawatt hours (TWh) of electricity in financial year (FY) 2026, equivalent to around 3% of total NEM operational electricity consumption.link链接
Build scale建设规模Average monthly data-centre demand in the NEM rose from nearly 200 MW (January 2018) to more than 700 MW (June 2026); in FY2026 NSW had 66% of it and Victoria 30%.NEM 数据中心月均需求从近 200 MW(2018 年 1 月)升至 700 MW 以上(2026 年 6 月);2026 财年新州占 66%,维州占 30%。actual实际2026-06Average monthly data centre demand observed across the NEM between January 2018 and June 2026 shows an increase from nearly 200 MW to more than 700 MW.link链接
Build scale建设规模AEMO lists 225 data centres with 67 GW of combined capacity in development, but notes grid-connection utilisation of about 27% in FY2026 and that 36% of the developing projects in its 2025 report were cancelled.AEMO 列出在开发的数据中心 225 个、合计 67 GW,但指出 2026 财年并网容量利用率约 27%,其 2025 年报告中的在开发项目有 36% 已取消。planned计划2026Projects in development: 225 data centres with 67 GW of combined capacitylink链接
Power电力Operating data centres in the NEM hold about 2.2 GW of maximum connection capacity and used about 27% of it in Q1 2026, at a load factor near 90%.NEM 运营中的数据中心持有约 2.2 GW 的最大接入容量,2026 年第一季度只用了其中约 27%,负荷率接近 90%。actual实际2026-Q1Actual demand in quarter 1 2026 suggests an aggregate utilisation of 27% of this maximum connection capacity for currently operating data centres, at a very high load factor nearing 90%.link链接
Power电力AEMO assumes a mature data-centre fleet will draw on average 45–51% of its connection capacity, depending on data-centre type.AEMO 假设成熟的数据中心群平均取用其接入容量的 45–51%,视数据中心类型而定。forecast assumption预测假设2026-08AEMO estimates that a mature fleet of data centres, considering planned capacity redundancy and diversified compute profiles, will average 45-51% average utilisation depending on data centrelink链接
Power电力AEMO shows its consumption forecast also as indicative average demand in GW; its GW axis equals TWh ÷ 8.76: about 1.7 GW in FY2030 and 3.9 GW in FY2036 (Step Change).AEMO 同时以 GW 表示的指示性平均需求展示其用电预测;其 GW 坐标轴等于 TWh ÷ 8.76:2030 财年约 1.7 GW,2036 财年约 3.9 GW(Step Change)。forecast预测2026-08Average data centre consumption and indicative average demand forecast by NEM region, Step Change, 2026-27 to 2045-46 (TWh and GW)link链接
Build scale建设规模Data-centre capacity at all development stages advised to AEMO, including operating sites and their expansions, more than doubled in a year, from 37.9 GW to 67.1 GW (March 2025 to March 2026); most is proposed or at enquiry.向 AEMO 报送的各开发阶段数据中心容量(含运营站点及其扩建)一年内翻倍以上,从 37.9 GW 增至 67.1 GW(2025 年 3 月至 2026 年 3 月);大部分处于提议或咨询阶段。planned计划2026-03Over the year, total capacity across all development stages more than doubled, from 37.9 GW to 67.1 GW.link链接
Build scale建设规模AEMO forecasts NEM data-centre electricity use to triple to around 15 TWh by FY2030 and reach around 34 TWh by FY2036 (Step Change).AEMO 预测 NEM 数据中心用电到 2030 财年增至三倍、约 15 TWh,到 2036 财年约 34 TWh(Step Change)。forecast预测2026-08data centre consumption is forecast to triple to around 15 TWh or 7.8% of forecast operational consumption by FY30 and grow nearly seven times to around 34 TWh or 13% of forecast operational consumption by FY36, before growth starts to taper off.link链接
Build scale建设规模NSW counts around 60 operating data centres and 19 State Significant Development projects valued at $50.3 billion.新州统计约 60 个运行中的数据中心,以及 19 个州重大开发项目,价值 503 亿澳元。actual and planned实际与计划2026-07As of July 2026, there are 19 projects in the State Significant Development (SSD) planning pipeline valued at $50.3 billion.link链接
Power电力The Prime Minister announced a legal obligation for the next generation of large data centres to underwrite new power supply, pay their full share of grid connection and be net generators.总理宣布将立法要求下一代大型数据中心为新增电源提供担保、全额承担并网成本,并成为净发电方。announced已宣布2026-07-15We will create a legal obligation for the next generation of large-scale data centres to underwrite new power supply.link链接
Policies政策National Cabinet agreed to develop consistent mandatory standards for data-centre energy, water and land use, with legislation intended for early 2027.全国内阁同意制定统一的数据中心能源、用水和用地强制标准,计划 2027 年初立法。announced已宣布2026-08-26The Commonwealth intends to legislate the AI standards in early 2027link链接
Power电力The AEMC advised ministers that data centres should surrender renewable certificates from new generators, show demand covered by new firm capacity, register as market participants and be flexible; governments decide.AEMC 建议部长:数据中心应交回新增发电的可再生能源证书、证明需求有新增稳定容量覆盖、注册为市场参与者并提供灵活性;由政府决定。advice建议2026-08-05Bring clean energy: data centres would surrender Renewable Electricity Guarantee of Origin (REGO) certificates from new, additional generators to offset the power they use.link链接
Water水NSW: data centres with water-intensive cooling use recycled water for 100% of cooling, or agree a transition to rainfall-independent water with their utility; interim potable use must allow cuts in drought, for example with hybrid cooling.新州:用水密集型冷却的数据中心须 100% 使用再生水,或与供水公司约定向不依赖降雨的水源过渡;过渡期使用自来水的须能在干旱时减少用水,例如采用混合冷却。guideline measure (75-day assessment)指引要求(75 天审批承诺)2026-08Data centres using water-intensive cooling systems will use recycled water for 100% of their cooling operations or have clear agreement in place with their water utility for the transition to rainfall-independent water.link链接
Water水Victoria: data centres will use recycled or non-drinking water for cooling, or offset their use and pay for upgrades; today they use less than 1% of Victoria's drinking water for cooling.维州:数据中心冷却将使用再生水或非饮用水,否则须抵消用量并支付改造费用;目前其冷却用水不足维州饮用水的 1%。announced已宣布2026-09-22Under our rules : data centres will use recycled or non-drinking water for cooling. If they can't do it immediately, they'll have to offset what they use, and pay for infrastructure upgrades they need.link链接
Efficiency rules能效要求NSW design targets for new data centres: dPUE ≤ 1.25 with dWUE ≤ 1.0 (potable) or ≤ 1.6 (non-potable), or dPUE ≤ 1.3 with dWUE ≤ 0.44, at the average annualised climate and 100% IT load.新州新建数据中心设计目标:dPUE ≤ 1.25 且 dWUE ≤ 1.0(自来水)或 ≤ 1.6(非饮用水),或 dPUE ≤ 1.3 且 dWUE ≤ 0.44,按年均气候和 100% IT 负荷计。guideline measure (75-day assessment)指引要求(75 天审批承诺)2026-08dPUE ≤ 1.25 and dWUE ≤ 1.0 (potable water) or dWUE ≤ 1.6 (non-potable water) … or dPUE ≤ 1.3 and dWUE ≤ 0.44link链接
Efficiency rules能效要求New Commonwealth data-centre facilities sourced outside the government panel must achieve 5-star NABERS Energy for Data Centres or equivalent, such as PUE 1.4 or less.联邦政府在采购框架外新租用或自有的数据中心须达到 NABERS 数据中心能效 5 星或同等水平,例如 PUE 不高于 1.4。in force from 2025-07-01自 2025-07-01 生效Summary, wording not yet checked against the source摘要,措辞尚未与来源核对 required to achieve and maintain 5 stars NABERS Energy for Data Centres or equivalent environmental rating such as a Power Usage Effectiveness of 1.4 or less.link链接
Policies政策Victoria's data-centre plan: bring own renewable supply and storage, match new demand with new generation, no data centres in residential zones and a 150 m buffer to homes.维州数据中心计划:自带可再生电源和储能、新增需求须匹配新增发电、不得建在住宅区、与住宅保持 150 米缓冲距离。announced已宣布2026-09-22The buffer is 150 metres between a data centre building and homeslink链接
Policies政策NSW commits to the development application assessment for data-centre projects that meet its guideline measures taking no longer than 75 days in state government hands.新州承诺,满足指引要求的数据中心项目,其开发申请评估在州政府手中的时间不超过 75 天。in force (policy)生效(政策)2026-08-17Committing to the development application assessment process taking no longer than 75 days in state government hands.link链接
Projects项目AirTrunk, Melbourne墨尔本: MEL2: over 354 MW, a site acquired for a second Melbourne campus (announced 2025-12-23); total deployable capacity in Melbourne over 630 MWMEL2:超过 354 MW,为墨尔本第二个园区收购的场地(2025-12-23 宣布);墨尔本可部署总容量超过 630 MWcapacity容量2025-12-23With over 354MW capacity, MEL2 will add more than A$5 billion in new direct investment and lift AirTrunk’s total deployable capacity in Melbourne to over 630 MWlink链接
Projects项目NEXTDC, Western Sydney悉尼西部: S7 Eastern Creek 550 MW+ IT capacity, in planning; S4 Horsley Park 365 MW IT capacityS7 Eastern Creek 550 MW 以上 IT 容量,规划中;S4 Horsley Park 365 MW IT 容量capacity容量link链接
Projects项目AWS, not named未注明: AU$20 billion, 2025–2029 (no MW stated)2025–2029 年 200 亿澳元(未写 MW)investment投资link链接
Projects项目Microsoft, not named未注明: A$25 billion by the end of 2029; footprint up more than 140% (no MW stated)2029 年底前 250 亿澳元;规模扩大 140% 以上(未写 MW)investment投资link链接
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W20 at 5 K: 2,220 hours a year; single years 2,082–2,374; lowest-year coverage 96%、5 K:每年 2,220 小时;单年 2,082–2,374;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W20 at 10 K: 339 hours a year; single years 292–397; lowest-year coverage 96%、10 K:每年 339 小时;单年 292–397;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W20 at 15 K: 0 hours a year; single years 0–0; lowest-year coverage 96%、15 K:每年 0 小时;单年 0–0;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W25 at 5 K: 5,328 hours a year; single years 4,872–5,709; lowest-year coverage 96%、5 K:每年 5,328 小时;单年 4,872–5,709;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W25 at 10 K: 2,220 hours a year; single years 2,082–2,374; lowest-year coverage 96%、10 K:每年 2,220 小时;单年 2,082–2,374;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W25 at 15 K: 339 hours a year; single years 292–397; lowest-year coverage 96%、15 K:每年 339 小时;单年 292–397;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W32 at 5 K: 8,417 hours a year; single years 8,314–8,554; lowest-year coverage 96%、5 K:每年 8,417 小时;单年 8,314–8,554;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W32 at 10 K: 6,710 hours a year; single years 6,217–7,170; lowest-year coverage 96%、10 K:每年 6,710 小时;单年 6,217–7,170;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W32 at 15 K: 3,373 hours a year; single years 3,151–3,598; lowest-year coverage 96%、15 K:每年 3,373 小时;单年 3,151–3,598;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W40 at 5 K: 8,741 hours a year; single years 8,715–8,760; lowest-year coverage 96%、5 K:每年 8,741 小时;单年 8,715–8,760;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W40 at 10 K: 8,664 hours a year; single years 8,599–8,740; lowest-year coverage 96%、10 K:每年 8,664 小时;单年 8,599–8,740;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W40 at 15 K: 8,025 hours a year; single years 7,781–8,248; lowest-year coverage 96%、15 K:每年 8,025 小时;单年 7,781–8,248;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W45 at 5 K: 8,757 hours a year; single years 8,746–8,760; lowest-year coverage 96%、5 K:每年 8,757 小时;单年 8,746–8,760;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W45 at 10 K: 8,741 hours a year; single years 8,715–8,760; lowest-year coverage 96%、10 K:每年 8,741 小时;单年 8,715–8,760;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Sydney (Sydney Airport)悉尼(悉尼机场) (94767099999), W45 at 15 K: 8,664 hours a year; single years 8,599–8,740; lowest-year coverage 96%、15 K:每年 8,664 小时;单年 8,599–8,740;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W20 at 5 K: 3,011 hours a year; single years 2,777–3,257; lowest-year coverage 81%、5 K:每年 3,011 小时;单年 2,777–3,257;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W20 at 10 K: 1,055 hours a year; single years 851–1,255; lowest-year coverage 81%、10 K:每年 1,055 小时;单年 851–1,255;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W20 at 15 K: 156 hours a year; single years 85–211; lowest-year coverage 81%、15 K:每年 156 小时;单年 85–211;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W25 at 5 K: 5,788 hours a year; single years 5,313–6,188; lowest-year coverage 81%、5 K:每年 5,788 小时;单年 5,313–6,188;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W25 at 10 K: 3,011 hours a year; single years 2,777–3,257; lowest-year coverage 81%、10 K:每年 3,011 小时;单年 2,777–3,257;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W25 at 15 K: 1,055 hours a year; single years 851–1,255; lowest-year coverage 81%、15 K:每年 1,055 小时;单年 851–1,255;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W32 at 5 K: 8,150 hours a year; single years 7,950–8,411; lowest-year coverage 81%、5 K:每年 8,150 小时;单年 7,950–8,411;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W32 at 10 K: 6,820 hours a year; single years 6,386–7,156; lowest-year coverage 81%、10 K:每年 6,820 小时;单年 6,386–7,156;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W32 at 15 K: 4,029 hours a year; single years 3,728–4,323; lowest-year coverage 81%、15 K:每年 4,029 小时;单年 3,728–4,323;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W40 at 5 K: 8,707 hours a year; single years 8,676–8,754; lowest-year coverage 81%、5 K:每年 8,707 小时;单年 8,676–8,754;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W40 at 10 K: 8,495 hours a year; single years 8,393–8,636; lowest-year coverage 81%、10 K:每年 8,495 小时;单年 8,393–8,636;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W40 at 15 K: 7,772 hours a year; single years 7,506–8,060; lowest-year coverage 81%、15 K:每年 7,772 小时;单年 7,506–8,060;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W45 at 5 K: 8,754 hours a year; single years 8,740–8,760; lowest-year coverage 81%、5 K:每年 8,754 小时;单年 8,740–8,760;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W45 at 10 K: 8,707 hours a year; single years 8,676–8,754; lowest-year coverage 81%、10 K:每年 8,707 小时;单年 8,676–8,754;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Western Sydney (Penrith)悉尼西部(彭里斯) (94763099999), W45 at 15 K: 8,495 hours a year; single years 8,393–8,636; lowest-year coverage 81%、15 K:每年 8,495 小时;单年 8,393–8,636;最低单年覆盖率 81%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W20 at 5 K: 5,261 hours a year; single years 4,812–5,710; lowest-year coverage 96%、5 K:每年 5,261 小时;单年 4,812–5,710;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W20 at 10 K: 2,039 hours a year; single years 1,655–2,327; lowest-year coverage 96%、10 K:每年 2,039 小时;单年 1,655–2,327;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W20 at 15 K: 224 hours a year; single years 158–298; lowest-year coverage 96%、15 K:每年 224 小时;单年 158–298;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W25 at 5 K: 7,494 hours a year; single years 7,247–7,706; lowest-year coverage 96%、5 K:每年 7,494 小时;单年 7,247–7,706;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W25 at 10 K: 5,261 hours a year; single years 4,812–5,710; lowest-year coverage 96%、10 K:每年 5,261 小时;单年 4,812–5,710;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W25 at 15 K: 2,039 hours a year; single years 1,655–2,327; lowest-year coverage 96%、15 K:每年 2,039 小时;单年 1,655–2,327;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W32 at 5 K: 8,449 hours a year; single years 8,342–8,503; lowest-year coverage 96%、5 K:每年 8,449 小时;单年 8,342–8,503;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W32 at 10 K: 7,897 hours a year; single years 7,705–8,059; lowest-year coverage 96%、10 K:每年 7,897 小时;单年 7,705–8,059;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W32 at 15 K: 6,364 hours a year; single years 5,989–6,762; lowest-year coverage 96%、15 K:每年 6,364 小时;单年 5,989–6,762;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W40 at 5 K: 8,736 hours a year; single years 8,711–8,747; lowest-year coverage 96%、5 K:每年 8,736 小时;单年 8,711–8,747;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W40 at 10 K: 8,621 hours a year; single years 8,538–8,664; lowest-year coverage 96%、10 K:每年 8,621 小时;单年 8,538–8,664;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W40 at 15 K: 8,284 hours a year; single years 8,150–8,376; lowest-year coverage 96%、15 K:每年 8,284 小时;单年 8,150–8,376;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W45 at 5 K: 8,759 hours a year; single years 8,756–8,760; lowest-year coverage 96%、5 K:每年 8,759 小时;单年 8,756–8,760;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W45 at 10 K: 8,736 hours a year; single years 8,711–8,747; lowest-year coverage 96%、10 K:每年 8,736 小时;单年 8,711–8,747;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA
Climate气候Melbourne (Melbourne Airport)墨尔本(墨尔本机场) (94866099999), W45 at 15 K: 8,621 hours a year; single years 8,538–8,664; lowest-year coverage 96%、15 K:每年 8,621 小时;单年 8,538–8,664;最低单年覆盖率 96%computed by this site本站计算2020–2024NOAA