Countries · United States国家地区 · 美国

Where can AI data centres be built in the United States, and how do power, water and rules shape the cooling?美国哪里建得起 AI 数据中心?电、水和规则怎样影响冷却选择?

3 of the 6 US AI campuses we count are in Texas.本站计入的 6 个美国 AI 园区中,3 个在得州。

In Texas they go through ERCOT's large-load process.得州园区须走 ERCOT 大负荷接入流程。

Records extracted 2026-07-05 to 2026-08-06; latest recheck 2026-09-04记录提取于 2026-07-05 至 2026-08-06;最近复核 2026-09-04Counted: single-state campuses with a stated IT load计入口径:位于单个州且公布 IT 负荷的园区

Build scale: tracked projects listed below建设规模:见下方项目 Policies: 3 sourced facts政策:3 条有来源 Efficiency rules: 3 sourced facts能效要求:3 条有来源 Power: 3 sourced facts电力:3 条有来源 Water: 4 sourced facts水:4 条有来源 Climate: 3 weather stations, 2020–2024气候:3 个气象站,2020–2024

PUE requirement or targetPUE 要求或目标

None无

No federal PUE or WUE cap for new data centres; LBNL estimates the US average PUE fell from 1.6 in 2014 to 1.4 in 2023联邦对新建数据中心没有 PUE 或 WUE 上限;LBNL 估计美国平均 PUE 从 2014 年的 1.6 降至 2023 年的 1.4

Federal level联邦层面LBNL estimateLBNL 估计ENERGY STARENERGY STARLBNLLBNL

WUE requirement or targetWUE 要求或目标

None无

No federal WUE cap for new data centres; California's laws signed in September 2026 require proposed data centres to disclose water use, which is a disclosure, not a limit联邦对新建数据中心没有 WUE 上限;加州 2026 年 9 月签署的法律要求拟建数据中心披露用水,这是披露要求,不是限值

Federal level联邦层面California: disclosure, not a limit加州:披露,不是限值source来源

Power build-out电力建设规模

~50GW

Incremental US data-centre electricity use by 2030, DOE national planning midpoint (published projections 35–108 GW)到 2030 年美国数据中心新增用电(以 GW 计),美国能源部全国规划中值(各方预测 35–108 GW)

Planning assumption规划假设In GW, not installed capacity以 GW 计,不是装机容量DOE 2025DOE 2025

Biggest constraint最大约束

Power电力

The biggest constraint is power: large loads must clear grid-interconnection processes such as ERCOT's, and California's laws signed in September 2026 make data centres pay grid-upgrade costs.最大约束是电力:大负荷须走 ERCOT 等电网接入流程,加州 2026 年 9 月签署的法律还要求数据中心承担电网升级费用。

Our reading of the sourced rules本站对有来源规则的解读Second: water其次:水source来源
AI campuses we track with a stated IT load, by state (MW per project)已跟踪且公布 IT 负荷的 AI 园区,按州(每个项目的 MW)
Texas: Meta得州:Meta 1,000 MW: target or approximate figure1,000 MW:目标或约数Texas: DataBank得州:DataBank 480 MW480 MWTexas: CyrusOne得州:CyrusOne 190 MW190 MWNevada: Vantage Data Centers内华达州:Vantage Data Centers 224 MW224 MWVirginia: STACK Infrastructure弗吉尼亚州:STACK Infrastructure 1,000 MW: lower bound1,000 MW:下限Wisconsin: Vantage Data Centers威斯康星州:Vantage Data Centers 902 MW: single media figure902 MW:单一媒体口径
TX Meta得州 Meta ~1,000 target目标约 1,000TX DataBank得州 DataBank 480480TX CyrusOne得州 CyrusOne 190190NV Vantage内华达州 Vantage 224224VA STACK弗吉尼亚州 STACK ≥1,000 lower bound≥1,000 下限WI Vantage威斯康星州 Vantage 902 media figure902 媒体口径

Solid bar: a stated campus figure. Hollow bar: a lower bound, a target or a single media figure (the label says which).实心:公布的园区数字。空心:下限、目标或单一媒体口径(标签注明)。

Not in the bars: multi-state programmes, which are not split by state (AWS / Amazon: 1,300 MW, target or approximate figure, national total; Meta: 4,000 MW, lower bound, across several sites; OpenAI / Oracle / SoftBank (Stargate): 10,000 MW, target or approximate figure, across several sites); and xAI, whose 300 MW is a power-supply figure, not IT load.不进入柱状图:跨州项目(没有按州拆分:AWS / Amazon:1,300 MW,目标或约数,全国合计;Meta:4,000 MW,下限,跨多个站点;OpenAI / Oracle / SoftBank (Stargate):10,000 MW,目标或约数,跨多个站点);以及 xAI,其 300 MW 是供电口径,不是 IT 负荷。

Thermal meaning热管理含义

Policy, efficiency, power and water政策、能效、电力与用水

Policies政策

  • Since 18 March 2025, Loudoun County (Virginia) makes data centres a conditional or special-exception use where they were allowed by right; zoning standards for data centres and substations (phase 2) are in progress.自 2025 年 3 月 18 日起,弗吉尼亚州劳登县将原可直接建设的数据中心改为有条件用途或特别例外用途;数据中心和变电站的分区标准(第二阶段)正在制定。 in force生效中 2025-03-18 source来源
  • Virginia exempts data-centre computer equipment, including chillers and backup generators, from sales tax until 30 June 2035 if the site invests at least $150 million and creates 50 jobs at 1.5× local average wage (lower thresholds in distressed localities; extensions possible).弗吉尼亚州对数据中心计算设备(含冷水机组和备用发电机)免征销售税至 2035 年 6 月 30 日,条件是投资至少 1.5 亿美元并创造 50 个工资达当地平均 1.5 倍的岗位(欠发达地区门槛较低;可申请延期)。 in force生效中 2026-10 source来源
  • California's seven data-centre laws (signed 2026-09-21) require water and electricity reporting, make data centres pay grid-upgrade costs and remove blanket environmental exemptions; streamlining requires meeting state energy, water and fuel standards.加州七项数据中心法律(2026-09-21 签署)要求报告用水和用电,由数据中心承担电网升级费用,并取消一揽子环评豁免;须达到州能源、用水和燃料标准才可获简化审批。 announced已宣布 2026-09-21 source来源

Efficiency rules能效要求

  • LBNL estimates the average US data-centre PUE fell from 1.6 in 2014 to 1.4 in 2023, and projects 1.15–1.35 by 2028 as hyperscale, colocation and liquid-cooled AI servers grow.LBNL 估计美国数据中心平均 PUE 从 2014 年的 1.6 降至 2023 年的 1.4,并预计随着超大规模、托管和液冷 AI 服务器增加,2028 年降至 1.15–1.35。 historical estimate and forecast历史估计与预测 2023 source来源
  • California's 2025 Energy Code (permits from 2026-01-01) prescribes for computer rooms above 20 W/ft²: an air or water economizer, fan power ≤ 27 W/kBtu·h and air containment above 10 kW; it sets no PUE limit.加州 2025 年版能效规范(2026-01-01 起申请的许可适用)对功率密度超过 20 W/ft² 的机房规定:须设空气或水侧节能器、风机功率 ≤ 27 W/kBtu·h、单间 IT 负荷超过 10 kW 须做气流封闭;未设 PUE 上限。 in force from 2026-01-01自 2026-01-01 生效 2026-01-01 source来源
  • ASHRAE 90.4-2025 sets data-centre mechanical (MLC) and electrical-loss (ELC) efficiency targets; ASHRAE says it is in IECC and 90.1 sections and Washington and Oregon codes, but not California's.ASHRAE 90.4-2025 规定数据中心机械负荷(MLC)和电气损耗(ELC)能效目标;据 ASHRAE,其条款已纳入 IECC 和 90.1 以及华盛顿州、俄勒冈州规范,但加州规范未采用。 standard (voluntary unless adopted)标准(未被采纳时自愿) 2026-09-04 source来源

Power电力

  • DOE adopted a national midpoint assumption of 50 GW of incremental data-centre electricity use by 2030; published projections range from 35 to 108 GW.美国能源部采用全国中值假设:到 2030 年数据中心新增用电 50 GW;各方预测区间为 35–108 GW。 forecast assumption预测假设 2025-07-07 source来源
  • LBNL projects 74–132 GW of US data-centre power demand in 2028 (converted from 325–580 TWh a year at an assumed 50% average utilisation); this is total facility load, not IT load.LBNL 预测 2028 年美国数据中心电力需求为 74–132 GW(由年用电 325–580 TWh 按平均利用率 50% 的假设换算);为数据中心总负荷,不是 IT 负荷。 forecast预测 2024-12-20 source来源
  • Texas SB 6 requires ERCOT interconnection standards for sites above 75 MW (or a lower PUC threshold); in energy emergencies, such loads with on-site backup generation may be directed to run it or curtail.得州 SB 6 要求为 75 MW 以上(或 PUC 规定的更低门槛)的站点制定 ERCOT 并网标准;能源紧急状态下,配有现场备用发电的此类负荷可被要求启动备用发电或削减负荷。 in force from 2025-06-20自 2025-06-20 生效 2025-06-20 source来源

Water水

  • LBNL estimates US data centres consumed 66 billion litres of water on site in 2023, 84% of it in hyperscale and colocation sites, and nearly 800 billion litres indirectly through electricity generation.LBNL 估计 2023 年美国数据中心现场直接耗水 660 亿升,其中 84% 在超大规模和托管数据中心;另通过发电间接耗水近 8,000 亿升。 historical历史 2023 source来源
  • Washington-area data centres consumed about 4 million gallons a day on site in 2025 (15 at peak): 1% of withdrawals but 9% of annual consumptive use; about 40% use air cooling only.华盛顿都市区数据中心 2025 年现场耗水平均约每天 400 万加仑(峰值日约 1,500 万):只占取水量的 1%,却占全年耗水量的 9%;约 40% 只用风冷。 actual实际 2025 source来源
  • Loudoun Water has supplied reclaimed (non-potable) cooling water to data centres since 2010; its 20-mile network delivered more than 750 million gallons to customers in 2025, saving as much potable water.Loudoun Water 自 2010 年起向数据中心供应再生水(非饮用水)用于冷却;其 20 英里管网 2025 年向用户输送超过 7.5 亿加仑,节省了等量的饮用水。 actual实际 2025 source来源
  • California's data-centre laws, signed 2026-09-21, require proposed data centres to give local governments and water suppliers information on water use, supply, efficiency and drought planning, and to pay for supply upgrades.加州数据中心法律(2026-09-21 签署)要求拟建数据中心向地方政府和供水商提供用水量、水源、用水效率和干旱应对计划等信息,并承担供水改造费用。 announced已宣布 2026-09-21 source来源

Policy timeline政策时间轴

Database view: the US records used on this page数据库视图:本页使用的美国记录71 rows71 行
Showing显示 71Investment records, facts and policies shown above, and the climate hours behind the thermal meaning (2020–2024 average, NOAA hourly observations, dry cooler supplying the facility water directly). Values in different units are never added together. Investment scope is recorded in Chinese; fact rows give the source's own wording.上文使用的投资记录、事实和政策,以及热管理含义所依据的气候小时数(2020–2024 年平均,NOAA 逐时观测,假设干冷器直接供设施水)。不同单位的数值不相加。投资口径为中文原记录;事实行给出来源原文。
Record记录Company or authority公司或机构Place地点Metric指标Value数值Unit单位Kind or status类型或状态Date日期Scope (as recorded)口径(原记录)Source来源
Investment投资Vantage Data CentersUS-Nevada (Reno/Sparks)it_load_mw224MWstated figure公布的数字2025Reno/Sparks 园区link链接
Investment投资Vantage Data CentersUS-Wisconsin (Port Washington)it_load_mw902MWsingle media figure单一媒体口径2025Lighthouse 园区 IT load 线索link链接
Investment投资CyrusOneUS-Texas (Bosque County)it_load_mw190MWstated figure公布的数字2025DFW10 hyperscale campus(与 Calpine 合作)link链接
Investment投资STACK InfrastructureUS-Virginia (Stafford)it_load_mw1,000MWlower bound下限2025Stafford Technology Campus 1GW+(下限)link链接
Investment投资DataBankUS-Texas (Red Oak, South Dallas)it_load_mw480MWstated figure公布的数字2025Red Oak campuslink链接
Investment投资MetaUS-Texas (El Paso)it_load_mw1,000MWtarget or approximate figure目标或约数2026 – 2028El Paso 园区 IT 容量目标约 1GWlink链接
Investment投资AWS / AmazonUS-Federalit_load_mw1,300MWtarget or approximate figure, national total目标或约数,全国合计2026美国政府专用 AI/HPC 基础设施容量(约)link链接
Investment投资MetaUS(LA/TX/IN/OH)it_load_mw4,000MWlower bound, across several sites下限,跨多个站点2025 – 2030Richland/El Paso/Lebanon/New Albany 四个园区完成后各 1GW+ 的合计线索link链接
Investment投资OpenAI / Oracle / SoftBank (Stargate)US(Abilene TX 等)it_load_mw10,000MWtarget or approximate figure, across several sites目标或约数,跨多个站点2025 – 2029Stargate 公开目标:到 2029 美国 AI 基础设施 10GW(官方称已提前突破承诺口径)link链接
Investment投资xAIUS-Tennessee (Memphis)it_load_mw300MWpower-supply figure, not IT load供电口径,不是 IT 负荷2024Colossus 阶段性供电上限口径(150-300MW 区间取上限)link链接
Power电力US Department of EnergyUnited Statesincremental data-centre electricity use by 2030到 2030 年数据中心新增用电50GWplanning midpoint; projections 35–108 GW规划中值;预测 35–108 GW2025-07-07Various organizations' projections for incremental data center electricity use by 2030 range widely (35 GW to 108 GW). DOE adopted a national midpoint assumption of 50 GW by 2030link链接
Power电力United StatesLBNL projects 74–132 GW of US data-centre power demand in 2028 (converted from 325–580 TWh a year at an assumed 50% average utilisation); this is total facility load, not IT load.LBNL 预测 2028 年美国数据中心电力需求为 74–132 GW(由年用电 325–580 TWh 按平均利用率 50% 的假设换算);为数据中心总负荷,不是 IT 负荷。forecast2024-12-20with the low and high end of roughly 325 and 580 TWh in 2028 … Assuming an average capacity utilization rate of 50%, this annual energy use range would translate to a total power demand for data centers between 74 and 132 GW.link链接
Power电力United StatesTexas SB 6 requires ERCOT interconnection standards for sites above 75 MW (or a lower PUC threshold); in energy emergencies, such loads with on-site backup generation may be directed to run it or curtail.得州 SB 6 要求为 75 MW 以上(或 PUC 规定的更低门槛)的站点制定 ERCOT 并网标准;能源紧急状态下,配有现场备用发电的此类负荷可被要求启动备用发电或削减负荷。in force from 2025-06-202025-06-20The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary … large load customers with on-site backup generating facilities may be directed to either deploy the customer's on-site backup generating facilities or curtail load.link链接
Water水United StatesLBNL estimates US data centres consumed 66 billion litres of water on site in 2023, 84% of it in hyperscale and colocation sites, and nearly 800 billion litres indirectly through electricity generation.LBNL 估计 2023 年美国数据中心现场直接耗水 660 亿升,其中 84% 在超大规模和托管数据中心;另通过发电间接耗水近 8,000 亿升。historical2023By 2023, hyperscale and colocation account for 84% of the 66-billion-liter total … The total indirect water footprint of U.S. data centers is nearly 800 billion literslink链接
Water水United StatesWashington-area data centres consumed about 4 million gallons a day on site in 2025 (15 at peak): 1% of withdrawals but 9% of annual consumptive use; about 40% use air cooling only.华盛顿都市区数据中心 2025 年现场耗水平均约每天 400 万加仑(峰值日约 1,500 万):只占取水量的 1%,却占全年耗水量的 9%;约 40% 只用风冷。actual2025Within the WMA, average consumptive use in 2025 is approximately 4 MGD, with peak-day use of about 15 MGD … many facilities (about 40%) to exclusively rely on air cooling … data centers account for only 1% of total withdrawals in the WMA, they represent 9% of annual consumptive uselink链接
Water水United StatesLoudoun Water has supplied reclaimed (non-potable) cooling water to data centres since 2010; its 20-mile network delivered more than 750 million gallons to customers in 2025, saving as much potable water.Loudoun Water 自 2010 年起向数据中心供应再生水(非饮用水)用于冷却;其 20 英里管网 2025 年向用户输送超过 7.5 亿加仑,节省了等量的饮用水。actual2025In 2010 Loudoun Water constructed the first pipelines of the reclaimed water distribution system to supply irrigation and industrial cooling water to Loudoun County's rapidly growing data center industry. The reclaimed water distribution system has since expanded to 20 miles of pipeline. In 2025, Loudoun Water delivered more than 750 million gallons of reclaimed water to customers, helping to save an equal amount of potable drinking waterlink链接
Water水United StatesCalifornia's data-centre laws, signed 2026-09-21, require proposed data centres to give local governments and water suppliers information on water use, supply, efficiency and drought planning, and to pay for supply upgrades.加州数据中心法律(2026-09-21 签署)要求拟建数据中心向地方政府和供水商提供用水量、水源、用水效率和干旱应对计划等信息,并承担供水改造费用。announced2026-09-21requiring that proposed data centers provide information to local governments and water suppliers about water use, supply, efficiency and drought planning. Any upgrades needed to supply water would be paid for by the data center.link链接
Efficiency能效United StatesLBNL estimates the average US data-centre PUE fell from 1.6 in 2014 to 1.4 in 2023, and projects 1.15–1.35 by 2028 as hyperscale, colocation and liquid-cooled AI servers grow.LBNL 估计美国数据中心平均 PUE 从 2014 年的 1.6 降至 2023 年的 1.4,并预计随着超大规模、托管和液冷 AI 服务器增加,2028 年降至 1.15–1.35。historical estimate and forecast2023The resulting annual average PUE falls from 1.6 in 2014 to 1.4 in 2023 … by 2028, the average PUE falls to between 1.15 and 1.35link链接
Efficiency能效United StatesCalifornia's 2025 Energy Code (permits from 2026-01-01) prescribes for computer rooms above 20 W/ft²: an air or water economizer, fan power ≤ 27 W/kBtu·h and air containment above 10 kW; it sets no PUE limit.加州 2025 年版能效规范(2026-01-01 起申请的许可适用)对功率密度超过 20 W/ft² 的机房规定:须设空气或水侧节能器、风机功率 ≤ 27 W/kBtu·h、单间 IT 负荷超过 10 kW 须做气流封闭;未设 PUE 上限。in force from 2026-01-012026-01-01Computer rooms with a power density greater than 20 W/ft2 shall comply with this section. … The total fan power at design conditions of each fan system shall not exceed 27 W/kBtu·h of net sensible cooling capacity.link链接
Efficiency能效United StatesASHRAE 90.4-2025 sets data-centre mechanical (MLC) and electrical-loss (ELC) efficiency targets; ASHRAE says it is in IECC and 90.1 sections and Washington and Oregon codes, but not California's.ASHRAE 90.4-2025 规定数据中心机械负荷(MLC)和电气损耗(ELC)能效目标;据 ASHRAE,其条款已纳入 IECC 和 90.1 以及华盛顿州、俄勒冈州规范,但加州规范未采用。standard (voluntary unless adopted)2026-09-04including sections that are included in IECC, ASHRAE Standard 90.1 and incorporation into commercial energy codes in the states of Washington and Oregon. … California's energy code does not, however, adopt or reference Standard 90.4link链接
Policy政策United StatesSince 18 March 2025, Loudoun County (Virginia) makes data centres a conditional or special-exception use where they were allowed by right; zoning standards for data centres and substations (phase 2) are in progress.自 2025 年 3 月 18 日起,弗吉尼亚州劳登县将原可直接建设的数据中心改为有条件用途或特别例外用途;数据中心和变电站的分区标准(第二阶段)正在制定。in force2025-03-18Phase 1, approved on March 18, 2025, focused on proposed map and text amendments to the Loudoun County 2019 Comprehensive Plan, and amendments to the Loudoun County Zoning Ordinance, to designate data centers as a conditional or Special Exception (SPEX) use in areas where the uses were previously allowed by-right.link链接
Policy政策United StatesVirginia exempts data-centre computer equipment, including chillers and backup generators, from sales tax until 30 June 2035 if the site invests at least $150 million and creates 50 jobs at 1.5× local average wage (lower thresholds in distressed localities; extensions possible).弗吉尼亚州对数据中心计算设备(含冷水机组和备用发电机)免征销售税至 2035 年 6 月 30 日,条件是投资至少 1.5 亿美元并创造 50 个工资达当地平均 1.5 倍的岗位(欠发达地区门槛较低;可申请延期)。in force2026-10Beginning July 1, 2010, and ending June 30, 2035 … including chillers and backup generators used or to be used in the operation of the equipment exempted in this paragraph … of at least $150 million … at least 50 new jobs … pay at least one and one-half times the prevailing average wage in that localitylink链接
Policy政策United StatesCalifornia's seven data-centre laws (signed 2026-09-21) require water and electricity reporting, make data centres pay grid-upgrade costs and remove blanket environmental exemptions; streamlining requires meeting state energy, water and fuel standards.加州七项数据中心法律(2026-09-21 签署)要求报告用水和用电,由数据中心承担电网升级费用,并取消一揽子环评豁免;须达到州能源、用水和燃料标准才可获简化审批。announced2026-09-21Governor Newsom today signed seven bills to strengthen California's approach to data centers — requiring data centers to report about water and electricity use. … pay their fair share of grid update costs … by making data centers ineligible for blanket environmental exemptions and instead requiring data centers to demonstrate that the project will not shift costs to ratepayers, but will meet state standards on energy, water, and fuel consumption before any judicial streamlining could be approved.link链接
Policy政策United States (federal)USpue_new_buildIn force生效中No date无日期No federal PUE or WUE cap for new data centres; ASHRAE 90.4, ENERGY STAR and DOE/FEMP guidance serve as references.联邦无统一新建 DC PUE/WUE 硬上限;ASHRAE 90.4、ENERGY STAR DC Rating、DOE/FEMP 指南为参考口径link链接
Policy政策FERCUSnoneIn force生效中2026-062026-06FERC opened a section 206 proceeding requiring six grid operators to justify large-load rates or propose reforms.FERC 启动第 206 条程序,要求六大区域电网运营商说明大负荷费率公正合理或提出改革link链接
Policy政策ERCOTUS-TXgrid_threshold_mw75MWIn force生效中2025; Batch Zero 2026-072025;Batch Zero 2026-07Large loads go through ERCOT's large-load integration process; Batch Zero opened in July 2026 for projects able to energise before 2028.大负荷须走 ERCOT large load integration 流程;2026-07 开放 Batch Zero(面向 2028 年前可投运项目)link链接
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W20 water at 5 K仅靠干冷器制出 W20 水的年小时数,5 K4,490hcomputed by this site本站计算2020–2024single years 4,216–4,693; lowest-year coverage 100%单年 4,216–4,693;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W20 water at 10 K仅靠干冷器制出 W20 水的年小时数,10 K3,168hcomputed by this site本站计算2020–2024single years 3,006–3,288; lowest-year coverage 100%单年 3,006–3,288;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W20 water at 15 K仅靠干冷器制出 W20 水的年小时数,15 K1,794hcomputed by this site本站计算2020–2024single years 1,496–2,133; lowest-year coverage 100%单年 1,496–2,133;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W25 water at 5 K仅靠干冷器制出 W25 水的年小时数,5 K5,875hcomputed by this site本站计算2020–2024single years 5,692–6,058; lowest-year coverage 100%单年 5,692–6,058;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W25 water at 10 K仅靠干冷器制出 W25 水的年小时数,10 K4,490hcomputed by this site本站计算2020–2024single years 4,216–4,693; lowest-year coverage 100%单年 4,216–4,693;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W25 water at 15 K仅靠干冷器制出 W25 水的年小时数,15 K3,168hcomputed by this site本站计算2020–2024single years 3,006–3,288; lowest-year coverage 100%单年 3,006–3,288;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W32 water at 5 K仅靠干冷器制出 W32 水的年小时数,5 K7,845hcomputed by this site本站计算2020–2024single years 7,702–7,947; lowest-year coverage 100%单年 7,702–7,947;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W32 water at 10 K仅靠干冷器制出 W32 水的年小时数,10 K6,412hcomputed by this site本站计算2020–2024single years 6,226–6,555; lowest-year coverage 100%单年 6,226–6,555;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W32 water at 15 K仅靠干冷器制出 W32 水的年小时数,15 K4,953hcomputed by this site本站计算2020–2024single years 4,669–5,140; lowest-year coverage 100%单年 4,669–5,140;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W40 water at 5 K仅靠干冷器制出 W40 水的年小时数,5 K8,739hcomputed by this site本站计算2020–2024single years 8,708–8,760; lowest-year coverage 100%单年 8,708–8,760;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W40 water at 10 K仅靠干冷器制出 W40 水的年小时数,10 K8,390hcomputed by this site本站计算2020–2024single years 8,331–8,437; lowest-year coverage 100%单年 8,331–8,437;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W40 water at 15 K仅靠干冷器制出 W40 水的年小时数,15 K7,471hcomputed by this site本站计算2020–2024single years 7,283–7,626; lowest-year coverage 100%单年 7,283–7,626;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W45 water at 5 K仅靠干冷器制出 W45 水的年小时数,5 K8,760hcomputed by this site本站计算2020–2024single years 8,760–8,760; lowest-year coverage 100%单年 8,760–8,760;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W45 water at 10 K仅靠干冷器制出 W45 水的年小时数,10 K8,739hcomputed by this site本站计算2020–2024single years 8,708–8,760; lowest-year coverage 100%单年 8,708–8,760;最低单年覆盖率 100%NOAA
Climate气候NOAA 72403093738Northern Virginia (Washington Dulles)北弗吉尼亚(杜勒斯)hours a year a dry cooler alone can make W45 water at 15 K仅靠干冷器制出 W45 水的年小时数,15 K8,390hcomputed by this site本站计算2020–2024single years 8,331–8,437; lowest-year coverage 100%单年 8,331–8,437;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W20 water at 5 K仅靠干冷器制出 W20 水的年小时数,5 K2,697hcomputed by this site本站计算2020–2024single years 2,379–2,912; lowest-year coverage 100%单年 2,379–2,912;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W20 water at 10 K仅靠干冷器制出 W20 水的年小时数,10 K1,540hcomputed by this site本站计算2020–2024single years 1,252–1,831; lowest-year coverage 100%单年 1,252–1,831;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W20 water at 15 K仅靠干冷器制出 W20 水的年小时数,15 K641hcomputed by this site本站计算2020–2024single years 492–968; lowest-year coverage 100%单年 492–968;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W25 water at 5 K仅靠干冷器制出 W25 水的年小时数,5 K4,082hcomputed by this site本站计算2020–2024single years 3,684–4,484; lowest-year coverage 100%单年 3,684–4,484;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W25 water at 10 K仅靠干冷器制出 W25 水的年小时数,10 K2,697hcomputed by this site本站计算2020–2024single years 2,379–2,912; lowest-year coverage 100%单年 2,379–2,912;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W25 water at 15 K仅靠干冷器制出 W25 水的年小时数,15 K1,540hcomputed by this site本站计算2020–2024single years 1,252–1,831; lowest-year coverage 100%单年 1,252–1,831;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W32 water at 5 K仅靠干冷器制出 W32 水的年小时数,5 K6,388hcomputed by this site本站计算2020–2024single years 6,101–6,712; lowest-year coverage 100%单年 6,101–6,712;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W32 water at 10 K仅靠干冷器制出 W32 水的年小时数,10 K4,604hcomputed by this site本站计算2020–2024single years 4,232–5,000; lowest-year coverage 100%单年 4,232–5,000;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W32 water at 15 K仅靠干冷器制出 W32 水的年小时数,15 K3,139hcomputed by this site本站计算2020–2024single years 2,804–3,380; lowest-year coverage 100%单年 2,804–3,380;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W40 water at 5 K仅靠干冷器制出 W40 水的年小时数,5 K8,435hcomputed by this site本站计算2020–2024single years 8,141–8,632; lowest-year coverage 100%单年 8,141–8,632;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W40 water at 10 K仅靠干冷器制出 W40 水的年小时数,10 K7,451hcomputed by this site本站计算2020–2024single years 7,120–7,762; lowest-year coverage 100%单年 7,120–7,762;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W40 water at 15 K仅靠干冷器制出 W40 水的年小时数,15 K5,793hcomputed by this site本站计算2020–2024single years 5,533–6,134; lowest-year coverage 100%单年 5,533–6,134;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W45 water at 5 K仅靠干冷器制出 W45 水的年小时数,5 K8,736hcomputed by this site本站计算2020–2024single years 8,659–8,760; lowest-year coverage 100%单年 8,659–8,760;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W45 water at 10 K仅靠干冷器制出 W45 水的年小时数,10 K8,435hcomputed by this site本站计算2020–2024single years 8,141–8,632; lowest-year coverage 100%单年 8,141–8,632;最低单年覆盖率 100%NOAA
Climate气候NOAA 72259003927Dallas (Dallas/Fort Worth)达拉斯(达拉斯-沃斯堡)hours a year a dry cooler alone can make W45 water at 15 K仅靠干冷器制出 W45 水的年小时数,15 K7,451hcomputed by this site本站计算2020–2024single years 7,120–7,762; lowest-year coverage 100%单年 7,120–7,762;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W20 water at 5 K仅靠干冷器制出 W20 水的年小时数,5 K1,828hcomputed by this site本站计算2020–2024single years 1,606–1,967; lowest-year coverage 100%单年 1,606–1,967;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W20 water at 10 K仅靠干冷器制出 W20 水的年小时数,10 K597hcomputed by this site本站计算2020–2024single years 457–693; lowest-year coverage 100%单年 457–693;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W20 water at 15 K仅靠干冷器制出 W20 水的年小时数,15 K45hcomputed by this site本站计算2020–2024single years 24–54; lowest-year coverage 100%单年 24–54;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W25 water at 5 K仅靠干冷器制出 W25 水的年小时数,5 K3,160hcomputed by this site本站计算2020–2024single years 3,050–3,245; lowest-year coverage 100%单年 3,050–3,245;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W25 water at 10 K仅靠干冷器制出 W25 水的年小时数,10 K1,828hcomputed by this site本站计算2020–2024single years 1,606–1,967; lowest-year coverage 100%单年 1,606–1,967;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W25 water at 15 K仅靠干冷器制出 W25 水的年小时数,15 K597hcomputed by this site本站计算2020–2024single years 457–693; lowest-year coverage 100%单年 457–693;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W32 water at 5 K仅靠干冷器制出 W32 水的年小时数,5 K4,843hcomputed by this site本站计算2020–2024single years 4,648–5,011; lowest-year coverage 100%单年 4,648–5,011;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W32 water at 10 K仅靠干冷器制出 W32 水的年小时数,10 K3,603hcomputed by this site本站计算2020–2024single years 3,547–3,685; lowest-year coverage 100%单年 3,547–3,685;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W32 water at 15 K仅靠干冷器制出 W32 水的年小时数,15 K2,291hcomputed by this site本站计算2020–2024single years 2,095–2,410; lowest-year coverage 100%单年 2,095–2,410;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W40 water at 5 K仅靠干冷器制出 W40 水的年小时数,5 K7,116hcomputed by this site本站计算2020–2024single years 6,771–7,480; lowest-year coverage 100%单年 6,771–7,480;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W40 water at 10 K仅靠干冷器制出 W40 水的年小时数,10 K5,692hcomputed by this site本站计算2020–2024single years 5,347–6,017; lowest-year coverage 100%单年 5,347–6,017;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W40 water at 15 K仅靠干冷器制出 W40 水的年小时数,15 K4,434hcomputed by this site本站计算2020–2024single years 4,344–4,529; lowest-year coverage 100%单年 4,344–4,529;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W45 water at 5 K仅靠干冷器制出 W45 水的年小时数,5 K8,224hcomputed by this site本站计算2020–2024single years 7,958–8,447; lowest-year coverage 100%单年 7,958–8,447;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W45 water at 10 K仅靠干冷器制出 W45 水的年小时数,10 K7,116hcomputed by this site本站计算2020–2024single years 6,771–7,480; lowest-year coverage 100%单年 6,771–7,480;最低单年覆盖率 100%NOAA
Climate气候NOAA 72278023183Phoenix (Sky Harbor)凤凰城(天港)hours a year a dry cooler alone can make W45 water at 15 K仅靠干冷器制出 W45 水的年小时数,15 K5,692hcomputed by this site本站计算2020–2024single years 5,347–6,017; lowest-year coverage 100%单年 5,347–6,017;最低单年覆盖率 100%NOAA